STICK ON PLASTIC BASE – GREY
BIR007
For use with 95mm and 125mm Bird Posts
In order for the bases to be glued, it is important that the ledge surface is sufficiently prepared.
Porous surfaces need to be sealed.
The oil that coats new lead must be removed.
Use a cleaner to remove grease and oil deposits from metal surfaces.
Apply the AVIFIX adhesive and press firmly on the base allowing the glue rivets to for through the holes.
Allow the AVIFIX to ‘cure’ for 24 hours before installing the springs and wire.
Standard Springs can be used with this item.
Pk10 |