Greenzone Backer Rods are an integral component of sealant joints and provide three main functions that allow the sealant joint to perform and stop the ingress of pests – in particular ants cockroaches and termites.
- GFS Nail Kit 100 Pin + 1 Fuel Cell
GFS Nail Kit 100 Pin + 1 Fuel Cell is a professionally designed spare accessory, ideal for a wide range of actuated nail guns.
- Greenzone Termite Perimeter Barrier System
Greenzone Termite Perimeter Barrier System is a physical termite risk management measure that is flexible in nature and is classed as a chemical barrier in a non-soil matrix. It is a once only treatment that is designed to last the economical life of the building.
- Weepa Termite Protector Weep Hole Screen (PK20)
Bifenthrin infused flexible LDPE
Patented termite-resistant weep hole guard manufactured from bifenthrin infused plastic. Proven to deter termite entry through existing weep holes for up to 2 years as part of a termite management plan.
- Greenzone Termite Paint
2g/L bifenthrin
Greenzone Termite Paint is a unique and innovative solution that provides a long-lasting protective barrier against termites and other pests. The paint is easy to apply, making it an ideal solution for both residential and commercial properties. - Greenzone Termite Paint PrimerGreenzone Termite Paint Primer is recommended for use in conjunction with Greenzone Termite paint to ensure maximum protection.
-
- TERM-seal Ura-Fen Termite Resistant Adhesive 260g
TERM-seal Ura-Fen Termite Resistant Adhesive is a high-quality, solvent-based polymer adhesive, specifically formulated for bonding TERM-seal Ura-Fen Shield TWB to concrete, masonry and sealing joins and corners of the termite barrier.
- Notice for 'New Construction - Termite Management System' (Pack of 10)
Pack of 10 Notices
A templated sign and notice record for the installation of a Termite Management System during for new construction.
- Notice for 'Existing Construction - Termite Management System' (Pack of 10)
Pack of 10 Notices
A templated sign and notice record for the installation of a Termite Management System in an existing structure (post-construction).